On this page:

Timeline

  1. Exhibition opened

    18 May – 29 June 2026

  2. Exhibition closed

    Monday 29 June 2026

  3. Directions hearing

    10.00am Tuesday 14 July 2026

  4. Submitter conference and written submissions process

    Monday 10 to Wednesday 19 August 2026

  5. Report submitted

    8 October 2026

    Timing and release of the report is at the discretion of the Minister for Planning.

Overview

The Minister for Planning appointed the Star of the South Victorian Inquiry (the Inquiry) to advise on the environmental effects of the Victorian works of the proposed Star of the South Project on the Victorian environment as assessed in the Victorian Environment Effects Statement (EES).

The proposed works in Victoria associated with the Star of the South Project (works in Victoria) includes underground cables located in Victorian waters (approximately 5.5 km offshore) and on land between Reeves Beach and Giffard (approximately 30 kilometres) in Gippsland, Victoria.

The key components of the works in Victoria include the development of:

  • up to eight offshore export cables in Victorian waters to connect the offshore wind farm (located outside of Victorian waters) to the shore crossing
  • up to eight trenchless crossings for the export cables to make landfall at the shore crossing at Reeves Beach in South Gippsland; and
  • an underground cable system connecting the shore crossing to the proposed VicGrid connection hub.

Note: the development of the offshore wind turbines, offshore substations and inter array cables off Reeves Beach are located wholly in Commonwealth marine waters and are therefore not considered in the EES.

The Proponent is Star of the South Wind Farm Pty Ltd as trustee for the Star of the South Trust.

In line with the Inquiry’s Terms of Reference, the Inquiry:

  • reviewed the Victorian EES (covering Victorian works) and public submissions
  • ran a submitter conference to hear from the Proponent and submitters who wished to speak to their written submission on ‘Key Victorian Matters’
  • gave parties the opportunity to provide further written material on ‘Other Victorian Matters’
  • provided advice to the Minister about the environmental effects of the Victorian works of the proposed project on the Victorian environment, on the identified relevant ‘Key Victorian Matters’ and ‘Other Victorian Matters’.

It was not the role of the appointed Inquiry to consider the Commonwealth Environmental Impact Statement (EIS) or Commonwealth matters of national environmental significance, under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act), whether those matters are located in Victoria or elsewhere.

Inquiry and advisory committee members

Documents

You may view and download the exhibited EES, including draft Planning Scheme Amendment (PSA) C129well to the Wellington planning scheme and any relevant documents at Proponent’s webpage.

Terms of reference

More information

To find out more about the Star of the South Project, the EES, including the draft PSA, contact:

Southerly Ten (Star of the South)

Phone: 1800 340 340
Email: info@southerlyten.com.au
Website: https://southerlyten.com.au/project/star-of-the-south/

For more information about the Minister's Assessment and EES process contact:

Impact Assessment Unit
Department of Transport and Planning

Email: environment.assessment@transport.vic.gov.au

Accessibility and assistance

Deaf, hearing or speech impaired? Please contact the National Relay Service on 133 677 or www.relayservice.gov.au